This text was obtained via automated optical character recognition.
It has not been edited and may therefore contain several errors.


BAY ST. LOUIS MARINA
COST ESTIMATE
PHASE II
A.	BREAKWATER......................................$309,000.00
1.	BREAKWATER
2.	NAVIGATION LIGHTS
B.	DOCKING PIERS................................	7 5,000.00
1. WATER SERVICE
2	. ELECTRICAL CONNECTIONS AT EACH SLIP
C.	DREDGE AND FILL..............................	7 8, 52 0.00
1.	DREDGE HARBOR
2.	BEACH NURISHMENT
D.	, ASPHALTING OF	PARKING LOT......................	78,300.00
PROJECT COSTS	540,	820.00
CONTINGENCIES	54,100.00
ENGINEERING FEE	47.590.00
TOTAL PHASE II	$642,510.00


American Legion Pier 106
© 2008 - 2024
Hancock County Historical Society
All rights reserved