This text was obtained via automated optical character recognition.
It has not been edited and may therefore contain several errors.
BAY ST. LOUIS MARINA COST ESTIMATE PHASE II A. BREAKWATER...................................$309,000.00 1. BREAKWATER 2 . NAVIGATION LIGHTS B. DOCKING PIERS......................... 75,000.00 1. WATER SERVICE 2. ELECTRICAL CONNECTIONS AT EACH SLIP C. DREDGE AND FILL.............................. 78, 520.00 1. DREDGE HARBOR 2. BEACH NURISHMENT D. , ASPHALTING OF PARKING LOT...................... 78,300.00 PROJECT COSTS 540, 820 .00 CONTINGENCIES 54,100.00 ENGINEERING FEE 47.590.00 TOTAL PHASE II $642,510.00
American Legion Pier 094